Buildings Madeline Critchley Buildings Madeline Critchley

Andrew (Boy) Charlton pool refurbishment

MCM was engaged by the City of Sydney to carry out structural repair works to the ABC Pool. Previous inspections revealed the pool had recurring vertical cracks with active corrosion in the walls and gutters, and the steel members below pool deck level were in poor condition; some were observed with heavy corrosion and visible deformation. 

Read More
Water Madeline Critchley Water Madeline Critchley

Eastern Treatment Plant Tank Remediation 

A critical asset for Melbourne Water, the Eastern Treatment Plant is located in Bangholme in Victoria and treats around 40% of Melbourne’s sewerage. A key part of the treatment process is 24 secondary sedimentation tanks which remove further solids from the effluent being treated. Due to the aggressive nature of effluent on these assets over their lifespan, major refurbishment is required to ensure they can continue to effectively operate.

Read More
Heritage Madeline Critchley Heritage Madeline Critchley

Pyrmont Bridge Structural Restoration

Pyrmont Bridge is currently in variable condition, with deterioration to the structural timber fabric which needs to be stopped and reversed by a staged restoration process. This project is the first stage of the main truss restoration works.

Read More
Water Laura Coutts Water Laura Coutts

Wallis Hill CWT

For over a century, Wallis Hill Clear Water Storage tank has provided potable water storage for the town of Seymour. It comprises brick walls supported by unreinforced concrete buttresses and is approximately 35.1m long, 22.2m wide and 5m deep with a nominal capacity of 4ML. We rehabilitated the tank’s concrete substrate and replaced its liner to prolong service life.

Read More