Buildings Madeline Critchley Buildings Madeline Critchley

Andrew (Boy) Charlton pool refurbishment

MCM was engaged by the City of Sydney to carry out structural repair works to the ABC Pool. Previous inspections revealed the pool had recurring vertical cracks with active corrosion in the walls and gutters, and the steel members below pool deck level were in poor condition; some were observed with heavy corrosion and visible deformation. 

Read More
Heritage Madeline Critchley Heritage Madeline Critchley

Pyrmont Bridge Structural Restoration

Pyrmont Bridge is currently in variable condition, with deterioration to the structural timber fabric which needs to be stopped and reversed by a staged restoration process. This project is the first stage of the main truss restoration works.

Read More